Wednesday, April 17, 2024
HomeGroundHow Long Does It Take To Build An Inground Pool

How Long Does It Take To Build An Inground Pool

- Advertisment -

What Will Happen To My Yard

How Long Does It Take To Build A Pool?

Unless youre spending thousands extra on some hitherto unknown pool builder who uses a helicopter to remove excavated dirt and bring construction materials on-site, your yard is going to become a full-blown construction site.

This means you can kiss all the grass around the pool goodbye. Same goes for a roughly 20-foot by 20-foot area for all the materials.

The access lane might also incur some damages after having heavy construction vehicles using it.

Process: What Goes Into Getting A Pool

Ahead, discover all the non-negotiable steps you’ll need to take to install a pool. From start to finish, the process can take up to six monthsso plan accordingly.

1) Assemble a team. You can’t install a pool on your own, so a team who can help you get the job done well is essential. , founder of the eponymous Los Angeles-based design-build firm, says, “You can either hire a pool contractor that can do the design and construction, or you can hire an architect that can help design and permit the pool and then hire a pool contractor to build the pool.”

2) Ask yourself what you’ll use the pool for. Is it for laps and exercise? Entertaining the kids and family? Increasing resale value? Just aesthetics? All of these things will dictate your pool design, so consider them before you first meet with your team.

3) Make sure you look over regional codes and restrictions. For example, in California, “You have to have your pool minimum 5 feet from your property lines,” says Feldman, while in other states the distance is further. So there are a lot of things to really check before you set the pool’s location and this is especially true for historic or flipped homes. It’ll all effect the final design: “A handful of inches or a foot makes a big difference.”

The Quick Answer: Average Time To Build A Pool

There are three types of pools to consider: fiberglass, vinyl liner, and concrete . The construction time frame and cost can vary between each:

  • Fiberglass pools usually take anywhere from 14 to 30 days to build
  • Vinyl liner pools usually take around 25 to 45 days to build
  • Concrete pools typically take anywhere from 45 to 75 days build
  • I cover the above ground pool installation process in a separate article, which you can view here.

Its worth noting that the construction process happens in several stages. From the design phase to obtaining a permit and hiring a pool professional, we can break these numbers down even more for a more accurate model. Lets cover each step in the process.

Don’t Miss: Can You Wear Contacts In The Pool

Are You Looking To Build A Custom Pool

You now have your answer to how long does it take to build a pool? Time can vary wildly depending on several different factors.

Are you looking to have a custom pool built or want more information on the topic? Contact us today. One of our trained associates would be more than happy to answer all your questions.

Why Is It Taking So Long To Build A Pool

What If My Pool Has Too Much Chlorine?

Pool construction projects that used to take between 8 and 12 weeks from the first meeting to swimming are now taking at least twice that long because there is currently a much greater demand for swimming pools than there is supply.How long does a concrete pool need to cure?Water is the best curing method , and concrete needs to cure for seven days after being applied using the shotcrete process or cast-in-place.

Step By Step Process

  • Step 1: Layout & Design. Consult with our designers and engineers to assist with the 3D custom pool design.
  • The Dig is step two.
  • Steel installation is step three.
  • Step 4: Plumbing & Electrical.
  • Step 6: Decking and tile.
  • Step 7: Finish the interior.
  • Step 8: Start the pool.
  • How long does it take to install an inground vinyl pool?Vinyl liner pools can be built in 4 to 8 weeks. While this is less time than concrete pools, which can take at least 3 to 6 months to build, it is still a significant amount of time to have contractors using loud, large machinery in your yard.How do you dig a pool by hand?How to Dig Your Own Swimming Pool

  • Step 1: Select the Ideal Location.
  • Step 2: Purchase the appropriate gear.
  • Step 3: Continue to dig deeply.
  • Shape the pool in Step 4.
  • Fill it with concrete in Step 5.
  • Step 6: Build Your Wall with Concrete Blocks.
  • Finishing touches is step seven.
  • Add the paint in Step 8.
  • Read Also: How To Use Pool Clarifier

    How Long Does A Concrete Pool Take To Build

    The amount of time it takes to build a concrete pool varies based on the size and design. It can take anywhere from 3-6 months or more depending on the construction company and their workload. The cost also depends, with prices ranging from $25-$50 per square foot for labor and materials.

    If youre not in a hurry, then its worth waiting for the best deal! A concrete pool is a good option for those who want to swim in their backyard. It can take up to two weeks to complete the entire project and you will need help from professionals with experience in this area.

    Obtaining A Pool Building Permit

    The next step of the process is to review and sign the SPASA swimming pool project contract and pay the deposit before submitting an application for a pool building permit. This will be handled by your builder, and will involve submission to the surveyor for approval. In some cases, engineering drawings will also need to be created and attached to the application.

    In most cases, pool building permit applications are processed within two to four weeks. Sometimes, additional information or permits may be needed, so this can create more delays. Either way, your builder will keep you informed and will send you a copy of the building permit when it is obtained.

    Read Also: How Can I Get Rid Of Ducks In My Pool

    Vinyl Liner Pool Construction

    Pool builders offer three types of vinyl liners: steel wall, cement wall, and polymer wall vinyl liner. Seasonal Pools site says construction times are similar, regardless of the vinyl liner pool design, and will usually take between 25 to 45 days. Time will vary depending on the projects complexity and the number of inspections required by your township.

    Allowing The Gunite To Cure

    How Long Do Inground Pools Take To Build?

    Once the gunite has been sprayed, it must sit for 28 days before the plaster can be applied. Plaster is the smooth finish applied overtop of the gunite that forms the surface of the pool that you actually see. Before that can be completed, the gunite must fully cure.

    Of course, were not just twiddling our thumbs during this month-long period. This is typically the time we start building the patio and the features around it. Some of the features that would enhance your backyard include the following:

    • Outdoor kitchen
    • Pavilion, pergola, or shaded area
    • Outdoor fireplace or fire pits
    • Recreational areas

    Recommended Reading: How To Patch Pool Deck

    How Much Money Does It Take To Build An Inground Pool

    How much does it cost to build an inground pool? That is a question that many homeowners ask themselves before they decide whether or not to take the plunge. The answer, of course, varies depending on the size and complexity of the project as well as what you want in your finished product.

    But there are some basic numbers that can help you get started with your budgeting process. The average price for an above ground pool is $2,700 while an inground pool will cost about $4,000-$5,000 without any extras or special features added onto it.

    If you plan on installing a slide into your new swimming hole or adding a hot tub to enjoy after swimming laps then those costs should be included in the initial estimate

    Design Your Pool Project And Apply For Permits

    When you decide youre ready to build a pool, this is just the first of many important decisions youll need to make. Next, youll need to start exploring your options regarding size, shape, and other design elements, all of which impact how long it takes to build a pool.

    Your pool customization options are virtually limitless, so take some time to think about what you want. Its often helpful to look through inspiration galleries so you can get an idea of the wide array of possibilities.

    Once you have an idea of what you want, a professional pool designer can provide you with 3D representations of your finished project. You may need to back and forth a few times before you finalize the design and are ready to go.

    In general, you can expect the design process to take one to three weeks from the initial consultation until completion. The total time of how long it takes to build a pool depends on how complex your custom pool will be and how many revisions are needed to achieve your vision.

    The next step is to request the permits needed to build your pool legally. Unfortunately, this is one area where you and your pool contractors have little control. The length of time it will take to get your permit will depend on your municipality. It can be anywhere from one week to two months. However, once you have the permit in hand, youre ready to start building your pool!

    Average time: Two weeks to two months

    Recommended Reading: Do Salt Pools Use Chlorine

    Weather Affects Swimming Pool Construction

    Without question, weather is the primary factor affecting the completion dates of custom in-ground swimming pool construction projects. When it rains, the construction process is either completely stalled or significantly delayed. Even if you live in the Southeastern United States, temperature changes can have an impact on your project timeline.

    Getting Permission For The Pool

    Swimming Pool Construction Timeline

    Before anything else, your construction company will need permission for the pool. This can take between one and eight weeks. The broad time frame is because of the permitting process.

    First, theyll create a design and get it approved by you. This part of the process can take longer if you need alterations to the original design.

    Second, permits will need to be filed and approved by your municipality. Your contractor will include the design in the paperwork. How long this part takes is out of the hands of your contractor.

    Also Check: How To Get Rust Stains Off Bottom Of Pool

    Do Gunite Pools Take Forever

    No gunite pools they do not take forever, especially when you choose a quality builder. On average, they will take from forty five to seventy five days to be constructed. The reason that these pools take substantially longer than the other types of constriction is due in part to that they must have a twenty eight to thirty day cure time. From the time the shotcrete is applied, or the gunite is shot, the pool must cure. Although there is ancillary work that can go on while the pool cures, the pools interior finish cannot be applied. This generally provides a longer construction time. There is more labor involved in these types of pools as well as more detailed finishing work. This may include placing tile on the steps, around the perimeter of the pool and spa, and any other finishing material the end users desires. Seasonal conditions such as the time of the year and temperature, may also affect these types of pools. The time will also vary depending on the location of where the pool is installed, as well as the number of inspections required by the township. The nature and complexity of the project may also lengthen the time.

    Prepare Your New Pool For Swimming

    Before you jump in, youll have to make sure the pool is ready for you to use. This process includes:

    • Filling your pool with water
    • Installing the pool pump
    • Installing the pool filter
    • Installing the pool heater
    • Adding pool chemicals

    Average time : One to two weeks

    As you can see, the answer to the question, How long does it take to build a pool? comes with many variables, so its crucial to get a professional estimate for your specific project. At California Pools, we work with each customer throughout planning and installation, making sure the whole process is straightforward and understandable.

    Contact us today and schedule an appointment. Well help you decide on essential design elements, give you an accurate estimate, and let you know how long your specific project will take. Get your summer plans started now.

    Read Also: How Much Does An Inground Pool Cost In Arizona

    Stage : Gunite Plastering Vinyl Fiberglass

    During this phase of the construction, the pool professionals will install the pool into the hole dug by the excavation crew. This work will take from one to three weeks, depending on which type of pool you designed.

    For instance, if you have a vinyl or fiberglass pool, the manufacturer will ship it directly to your home for installation. This will take less time. On the other hand, if you purchased a gunite pool, the crew will have to be scheduled and then hand spray the concrete to form the pool. Once the plaster is in place, it will take about a week to cure.

    How Long Does It Take To Install A Pool

    Time Lapse: Building an Inground Swimming Pool

    Most people make the decision to install a pool when the weather is at its best. Tired of trekking to the beach or feeling theyve overstayed their welcome in their neighbors pools, theyve decided the best way to cool off is to install one of their own.

    Once youve finalized the design and know how much your new swimming pool will cost, the next consideration on most peoples mind is how long its going to take to get it in.

    How long it takes to install a pool will depend on several factors, including:

    • Planning process
    • New pool or renovation of the existing pool
    • Site selection
    • The time of the year
    • Building regulations
    • The number of contractors involved

    During the designing process, be sure to ask your pool expert about the timeframe. Its vital you have clear expectations of how long the design and install process takes to avoid disappointment and prevent unnecessary delays.

    Recommended Reading: How To Lower Hard Water In Pool

    How Much Does It Cost To Build A Pool

    Another common question asked by homeowners is the cost of pool construction. Well, pool construction costs vary depending on the type of pool. But prepare to spend thousands of dollars if you plan to construct an inground pool. An inground swimming pool measuring 32 by 16 feet costs about $22,000. Needless to say, the price depends on the type of pool contractor and the type of pool. However, concrete pools are the most costly, while vinyl pools are the cheapest. Vinyl pools go for about $25,700. Fiberglass pools, on the other hand, go for approximately $31,400, according to P.K data.

    The Best Time To Install A Pool

    • Spring is a great time to break ground on a pool if you want it to be ready for summer, though of you live somewhere rainy, flooding may be an obstacle.
    • Fall is another great season for the actual installation process, as the weather is steadier.
    • “The only constraint on timing is that, in the north,you don’t want to dig in the winter. The ground is frozen and it makes it very challenging,” architect RD Gentzler tells HB.

    Feldman also recommends a long-term approach if you aren’t ready to dive into construction: “Look at a yard opportunity holistically, even if you phase it out. Get it done in a packaged way wherever its possiblenobody needs a bobcat or concrete truck coming more than once.”

    You May Like: How To Keep Water From Pooling On Patio Furniture Cover

    Will I Have To Wait For Months

    Unquestionably, building an inground pool consumes a lot of time and effort. Even so, the steps involved to build a pool are pretty much straightforward. But first, you have to begin with choosing a particular pool design and layout. Then, you will need to conduct thorough research on the best pool contractors. In this article, well take a detailed look at each of these procedures involved.

    One: Meet Your Pool Designer

    Premier Pools &  Spas North Georgia

    Your pool begins with a design, so the first step is meeting your professional pool designer. He or she will visit your property to discuss the vision you have for your pool. This person will be your contact point throughout the process and will coordinate the entire effort.

    Your designer will listen to your ideas and offer material suggestions and layout options that will help give your new pool shape and form.

    If you give the go-ahead for a design, your designer will have a pool design to present to you in one to two weeks.

    Recommended Reading: How To Repair Leaking Underground Pool Pipes

    Tile Edge And Coping Process

    The final step of the pool construction process is adding the tile edge and coping. Tile will be applied along all of the surfaces that meet water, including the top edge of the walls and floor of the pool, as well as around the actual pool drain.

    The work required for this step can take anywhere from a single day to a couple of weeks, depending on how detailed the tile work is.

    We hope this information will be helpful as you plan to build your new inground pool!

    Florida Swimming Pool Construction Permits

    Pool construction permits is another factor where an experienced pool contractor can have a big impact on your projects timeline. Your pool contractor will discuss expected timelines for permitting, as they are unique to each area. Permitting timeframes change throughout the year. Finding and choosing an experienced, local pool builder is important as they can help move through the permitting process swiftly, and also have knowledge about any permitting requirements that are unique to your particular area.

    You May Like: How To Get Iron Out Of Your Pool Water

    RELATED ARTICLES
    - Advertisment -

    Most Popular

    - Advertisment -