How Much Does It Cost To Build A Pool

Time Lapse: Building an Inground Swimming Pool

Another common question asked by homeowners is the cost of pool construction. Well, pool construction costs vary depending on the type of pool. But prepare to spend thousands of dollars if you plan to construct an inground pool. An inground swimming pool measuring 32 by 16 feet costs about $22,000. Needless to say, the price depends on the type of pool contractor and the type of pool. However, concrete pools are the most costly, while vinyl pools are the cheapest. Vinyl pools go for about $25,700. Fiberglass pools, on the other hand, go for approximately $31,400, according to P.K data.

Building The Pool Shell 1 To 4 Weeks

The type of pool shell material you choose will affect how long this installation takes. Fiberglass pools come preassembled.

Once excavation is done a fiberglass pool can be installed and plumbing attached in a day. Vinyl on steel pool are assembled on site. Pool kits are bolted together, braces installed on pool walls and the concrete installed on the pool floor, the pool deck and around the plumbing walls on the outside of the pool.

Concrete pools by far take the longest to install. From framing to rebar to concrete poring and setting and finally surface finishing, gunite pools can take up to eight weeks to install.

Vinyl Liner

This type of pool is ideal for those who want to enjoy the benefits of a completely customizable pool without the luxury price tag. Vinyl liner pools are still the most popular pool today. Pool walls are usually steel or polymer and both are assembled on site.

Vinyl liner pools have concrete floors and either finished concrete decks or subdecks overlaid with pavers or natural stone. The time it takes to build a vinyl liner pool will vary depending on the type of pool and complexity of the project.

Bonus: Vinyl liner pools are ideal for cooler climates. They are less vulnerable than concrete pools to freeze/thaw cycles. Most new liners manufactured today also offer greater UV protection and come with aglae inhibitors built in.

Fiberglass

Concrete

Note: Concrete pools are not compatible with saltwater systems.

Categories

Installing The Pool 1

After the pool plumbing, the next step would be to install the pool. At this stage, it depends on the type of pool. For example, if you are constructing a concrete pool, you would spray concrete over the steel framework using a high-velocity hose. On the other hand, if you are installing a fiberglass pool, it takes about a week to finish construction. But on average, installing the pool takes about one to three weeks. Even so, keep in mind that gunite and shotcrete pools are likely to take longer due to the curing process.

Recommended Reading: Costco Chlorine Tabs

Excavating The Pool 1 Week

After obtaining the pool construction permits, your pool builder will come onsite to start on pool construction. They first dig up your pool area to create space for the pool. While doing this, they get rid of any debris in the pool area. Depending on how many people are onsite, this process usually takes a maximum of 7 days. If you have three or more pool builders excavating the pool area, this process can be complete within 2 to 3 days.

Have Us Install A Vinyl Or Fiberglass Pool With Fun Water Features

How Long Does It Take To Build A Pool

Our installers at our pool company take a holistic approach to your new pool construction. When designing a pool, we consider the context of its surroundings, including the backyard area and the architecture of your home.

Our customer service is second to none and our award-winning inground pool installation company can build you the pool of your dreams.

If youre in Hudson Valley, call . Westchester, call . Cold Spring, call , and in Connecticut, call . Or fill out our web form, and well get in touch with you to schedule a complimentary swimming pool consultation that will go over the average prices of installation costs.

We do our pool projects with the finest materials in the industry. We can build high-end pools of any shape and size using a variety of different materials to ensure that your pool will exceed your expectations.

Also Check: How To Take Calcium Off Pool Tile

Vinyl Liner Pool Construction

Pool builders offer three types of vinyl liners: steel wall, cement wall, and polymer wall vinyl liner. Seasonal Pools site says construction times are similar, regardless of the vinyl liner pool design, and will usually take between 25 to 45 days. Time will vary depending on the projects complexity and the number of inspections required by your township.

How Much Does An Underground Pool Liner Cost

Pool liners come in a range of thicknesses, and this affects the price you will pay. For example, a 28/20 mil 14 by 28 pool liner will average $600 while a thicker 28/28 20 by 40 pool liner will average $1,700. If you are replacing an existing pool liner with a new one, the labor costs associated with draining the existing pool, removing the current liner, and replacing it with the new liner are around $2,500.

Read Also: Older Replacement Pool Tiles

Do Gunite Pools Take Forever

No gunite pools they do not take forever, especially when you choose a quality builder. On average, they will take from forty five to seventy five days to be constructed. The reason that these pools take substantially longer than the other types of constriction is due in part to that they must have a twenty eight to thirty day cure time. From the time the shotcrete is applied, or the gunite is shot, the pool must cure. Although there is ancillary work that can go on while the pool cures, the pools interior finish cannot be applied. This generally provides a longer construction time. There is more labor involved in these types of pools as well as more detailed finishing work. This may include placing tile on the steps, around the perimeter of the pool and spa, and any other finishing material the end users desires. Seasonal conditions such as the time of the year and temperature, may also affect these types of pools. The time will also vary depending on the location of where the pool is installed, as well as the number of inspections required by the township. The nature and complexity of the project may also lengthen the time.

Why It Could Take Longer

How Long Does it Take to Install an In-Ground Swimming Pool

Pool projects can take longer than average for all sorts of reasons. Some issues become clear during the planning stages. Others show up as nasty surprises after the digging has started. Heres a list of the most common factors that add time to a project:

PermitsBefore installation can even begin, youll need to have all required pool permits in order. This could take days, weeks, or even months, depending on the type of pool and the building regulations in your area.

Builder and Subcontractor SchedulesFirst off, you have to get on the pool builders schedule, which could be tough depending on the time of year and how busy they are. However, the project is also dependent on the availability of subcontractors, who may be playing catchup on other projects.

Waterfalls and other fancy water features obviously increase the time it takes to install an inground pool.

Size and FeaturesThe estimates above are for typical inground pools. Obviously, if youre planning something elaborate or out of the ordinary, it could take longer to receive materials and/or complete the work.

The SiteMaybe you dont have adequate pathways for heavy equipment. Maybe the ground needs to be leveled out and a retaining wall installed. In a multitude of ways, the site you choose for your pool could complicate things for your builder and add time to the project.

You May Like: Pool Decking Material Options

How Much Does A Pool Cost In Houston Texas

According to Premier Pools and Spas, pool prices in Houston, Texas have an average base price which starts around $20,000 to $28,000 in most areas. From there, costs rise as you add upgrades like spas, pool covers, etc. If your land needs grading or extra excavation because of rocky terrain, this can add significantly to your pool cost in the Houston area.

Day Max Completion Time From Signing To Finish

After designing, acquiring permits, excavating, installing the shell or gunite, and finishing with a deck or patio, you can finally enjoy your backyard oasis! While 45 days can seem like a long time, its a blink of the eye in comparison to the years of fun that will be had in your new pool.

And although the pool building process can be an extended one, getting access to financing is super easy! Visit our Pool Financing page for more info on how you can get FREE Upgrades through our A Pool and Spa discount:

Also Check: Can Vdara Use Aria Pool

Planning Your Dream Pool

One of the most time-consuming aspects of the process is the phase spent considering the pool design. To a great degree, the design process will influence the answer to the question how long does it take to install a pool?

Straightforward pool designs can take a couple of weeks but, for more complex concrete pool shapes and designs, the concept process can take months.

After signing your contract, it can take four to six weeks before excavation starts.

Your pool builder will need to get engineer plans and working drawings which are then submitted to the council for building approval. A planning permit may be required and this can take up to six weeks.

Gunite Plastering Vinyl Fiberglass 1

How long does it take to build a pool?

If youre installing a vinyl or fiberglass pool, this process is fairly easy as the manufactured pool liner is brought in and installed. If youre getting a gunite swimming pool, however, this takes a little bit longer. We have to schedule the gunite crew and then plaster, and allow time for the gunite to cure .

Recommended Reading: How To Warm Water In Above Ground Pool

Regarding Rock And Ground Water

In the previous section, we mentioned that hitting rock or groundwater can be an unexpected complication in the excavation process. Unless youve had soil testing done , it can easily become a hidden expense.

Be prepared, not only by having a soils test performed, but by asking your pool builder what their plan is for handling such situations if and when they arise.

Rock

Typically, if you hit a lot of rock during the excavation, you have 4 options:

Ground Water

Here, you only have 2 options:

  • Install a dewatering system and pump the water out. Youll have to wait until the area is completely dry before your pool construction can continue. This method works best with fiberglass pools, as installation is a lot quicker. Just be aware that you may have to pay for extra fill to help prevent cave-ins gravel typically works a lot better than reusing the excavated dirt.
  • Elevate the pool. This is the same as with hitting bedrock. You might have to pay for some extra fill too, depending on the soil quality.

The Actual Time To Build A Pool

However, the overall time it takes to go from first contact with your builder to when your swimming in your pool can be up to 10 weeks or more. This is a realistic estimate based on all the variables and really isnt that long when you consider the change your backyard is going to undertake. However, add to this a busy season when all the good pool builders have full schedules and you can potentially add even more time. Thats why you need to get started now.

We want you to be swimming this spring! So dont wait. Remember that the process to become a pool owner is longer than just the time it takes to build a pool. This is true for all quality pool builders who want to make sure you get the pool of your dreams. So get started today!

Read Also: How Do You Get Iron Out Of Pool Water

How Much Dirt Are You Expecting

Customers always underestimate how much dirt needs to be excavated for a pool.

As a general rule-of-thumb, for the average pool size, picture how dirt much you expect there to be. Now multiply that by 5, or even 10.

Youre looking at about 5 garden sheds worth of dirt.

Arrange for the dirt to be reused as filler if possible, and for your pool builder to remove the excess. Otherwise youre going to end up spending a number of weekends with a wheelbarrow.

How Much Time Would It Take To Dig An Underground Pool

How Long Does It Take To Build A Pool? | California Pools & Landscape

This is a pretty cool video. This guy starts with just a simple tool and digs a giant hole in the ground. From this hole, he makes a small swimming pool and a little underground room. But damnhow long would it take to make this? The video is only 20 minutes long, but surely it must take much longer than that to build the pool-house thingy.

How about an estimate? Let’s estimate how long it would take a mostly normal human to dig this out. This is a great example of the power of estimations. I don’t need to get an exact value . However, if I get a build time of 10 hours that seems like something I could do. A build time of 1,000 hours would take one person months to build. OK, let’s do this and see what we get.

There are couple of parts to this estimation. First there is the volume. What is the volume of dirt that needs to be removed? This isn’t a terribly difficult estimation. I just need the length, width, and height of the hole to calculate the volume. Second is the volume per “scoop.” Notice that the guy digs for a bit and then gathers the debris to throw it out. If I know the volume and the time per scoop, I can find the number of scoops and therefore the total dig time. That’s the plan.

  • Dig time = 10 seconds.
  • Scoop time = 6 seconds.
  • Toss time = 3 seconds.

Like I said, here are my calculations .

Content

Read Also: How To Keep Above Ground Pool Warm

How Long Should An Above Ground Pool Installation Take

  • /
  • How long should an above ground pool installation take?

There is no doubt about it, there is NOTHING like spending summer by the pool. It doesnt matter whether you live by the beach or somewhere *inland* having a pool provides a range of advantages

  • Its a safe place for you and your family to relax
  • It increases the amount of time you spend outside
  • It increases your levels of fitness
  • It increases the value of your home

For families a pool helps alleviate summer holiday boredom and gives your children a safe place to play and have fun, if you cant get to the beach you can still enjoy the fun of water and sun, right in your own backyard you also avoid all those crowds!

People choose to build an above ground pool because they are fast to install, affordable and easy to maintain. Above ground pools are every bit as safe and fun as an in-ground pool. Depending on your yard, and your installer you can have your pool up and running anywhere from 24-72 hours later. Above ground pools are also easy to remove.

With the days getting longer and the weather warming up, spending time around the pool is one thing the whole family will love to do dont let another summer pass without a pool.

Also Read This: Why above ground pools are still so popular?

If you would prefer, your pool supplier will be able to arrange installation of the new pool for you.

Everything You Need To Know Before Getting A Pool

So the process goes swimmingly.

Summer days are simply better with a swimming pool in your very own backyard. But before you toe-dip, swan dive, or cannonball into the deep end, you’ll need to do a little planning. To prep you and your backyard for the best pool imaginable, we tapped three experts to share all the nitty-gritty details from step 1 to opening day .

Whether your pool is 10′ x 10′ or 25′ x 100′, the ingredients to building a pool are really the same,” says interior design Jenn Feldman. Some of the things they say you do need to consider before going all in are size, depth, position and location in your yard, and how much sun exposure it getsnot to mention whether or not a pool is a good investment for your property, and if “you can fit a Bobcat back in the yard for things like digging, pouring, and tiling.”

Don’t Miss: Is The Mandalay Bay Pool Open

Are You Ready To Start With Your Pool Installation

As you can see, there isa lot to consider in the steps it takes to build a pool. Many people who have done it will tell you it was one of the best decisions theyve made.

However, it can quickly become one of the worst decisions if you dont have the right financing in place.

Get started with SuperMoneys loan offer engine to receive personalized offers from several leading lenders. You can then compare each lender, plus many others, to ensure you make the best decision.

Youll then be one step closer to finally having the pool youve always dreamed of.

Design And Permitting 1 To 8 Weeks

How Long Does It Take to Build a Fibreglass Swimming Pool ...

This is the most difficult stage to estimate time for. While the design process is as simple as ever thanks to our use of 3D modeling, there will likely be many stages while we work with you to design the perfect pool custom fit to what you envision. On top of that, permitting is often out of our control. We have years of experience working with municipalities, but depending on where you live, this can be a simple process or a long-drawn out process. We do everything we can to hurry the process, and have good relationships with the cities we build in, so almost always this is the best case scenario instead of the worst.