Friday, April 19, 2024
HomePopularHow Long Does Pool Construction Take

How Long Does Pool Construction Take

- Advertisment -

Diy Vs Hiring A Pool Builder

How Long Does It Take To Build A Pool?

A DIY inground pool project could save you $6,000 to $10,000 on an inground fiberglass pool project that would have cost& $40,000 to $55,000 with a professional pool company.

With all of the expertise required to install a new pool and ensure good soil drainage, land grading, and excavation, the long-term results of a DIY pool install might not be worth it if you dont do everything correctly, despite the price reduction on the install.

Unexpected costs can be added on if you hire someone to excavate and your soil is too rocky for them to complete the job for the given estimate and if the soil isnt backfilled correctly, the additional pressure on the pool during heavy rains can cause it to crack and leak.

An additional factor is that the pool warranty might be nonexistent if its not installed by a professional, because you cant give any proof that you have followed all the manufacturers protocol during installation.

Get free home improvement estimates on HomeGuide from trusted pool companies:

Why It Could Take Longer

Pool projects can take longer than average for all sorts of reasons. Some issues become clear during the planning stages. Others show up as nasty surprises after the digging has started. Heres a list of the most common factors that add time to a project:

PermitsBefore installation can even begin, youll need to have all required pool permits in order. This could take days, weeks, or even months, depending on the type of pool and the building regulations in your area.

Builder and Subcontractor SchedulesFirst off, you have to get on the pool builders schedule, which could be tough depending on the time of year and how busy they are. However, the project is also dependent on the availability of subcontractors, who may be playing catchup on other projects.

Waterfalls and other fancy water features obviously increase the time it takes to install an inground pool.

Size and FeaturesThe estimates above are for typical inground pools. Obviously, if youre planning something elaborate or out of the ordinary, it could take longer to receive materials and/or complete the work.

The SiteMaybe you dont have adequate pathways for heavy equipment. Maybe the ground needs to be leveled out and a retaining wall installed. In a multitude of ways, the site you choose for your pool could complicate things for your builder and add time to the project.

Now That Youve Decided Lets Try To Answer How Long Does A Pool Take To Build

*Want a quick look at a time-lapse of a pool being installed? .

The summer heat is closing in on us , youve decided to take the plunge and have your inground swimming pool built. Great decision youll love your new swimming pool and its the perfect time to build a great place to entertain and cool off in the summer. But its May, and youre getting antsy to take a dive how long do you have to wait? While we cant give very specific times, well give you a general breakdown of how long you can expect to be swimming from the time you sign the contract with us.

Swimming pool installation is a lengthy process, sure, but it can be broken down to a few general steps to get an idea of where you are in the process starting with design and permits, to excavation, plastering, and then finally relaxing on your tanning shelf with your feet in the cool water.

You May Like: Murray City Indoor Pool

Do You Build Many Diving Pools Or Are They Mainly Play Pools

These days, play pools are the most popular types of pools. We can still construct diving pools, but they are generally more expensive and must follow several guidelines for safety reasons. For those who are interested in a diving pool, there are now many options beyond an actual diving board, including jump boards and diving rocks built into the surrounding landscape or a waterfall.

How Long Does It Really Take To Build A Pool

How Long Does it Take to Build a Pool?

by Wes Gohlke

One very common question we receive is how long will it take to build an in-ground swimming pool? This is a very loaded question, being that there is much more to the process than excavating the pool and proceeding from there. Much like building a home, there is a considerable amount of planning that takes place before clearing the lot, setting foundation forms, and beginning the job. You can expect numerous design meetings, budget modifications, material selections, a lengthy funding process, HOA approvals, permitting, and many things in between. Therefore, a six-to-twelve-week home building process is merely the tip of the iceberg of what should be expected as a whole. The same goes with a swimming pool. As less complicated jobs can take eight to ten weeks from excavation to completion, and more intricate jobs fourteen to eighteen weeks to completion, the planning process is something that needs to be considered sooner rather than later. Following is a timeline of what can be expected on most pool projects:

You May Like: How Big Of A Pool Filter Do I Need

Vinyl Liner Pool Construction

Pool builders offer three types of vinyl liners: steel wall, cement wall, and polymer wall vinyl liner. Seasonal Pools site says construction times are similar, regardless of the vinyl liner pool design, and will usually take between 25 to 45 days. Time will vary depending on the projects complexity and the number of inspections required by your township.

On Average How Long Does It Take To Build A Pool

Luckily, you may still have time to enjoy your pool this summer! Although many variables impact installation time, the average for a backyard pool is about six to 12 weeks.

To help you estimate and plan, weve detailed the main steps involved in the pool-building process and the estimated time needed for each. Read on to discover all you need to know to get your summer plans moving as soon as possible.

Recommended Reading: Pool Geek Chemicals

Concrete / Shotcrete / Gunite Pools

As mentioned earlier, concrete pools incur the most extended construction period. The reason behind this is the curing process. Simply put, after spraying concrete over the rebar, pool contractors will leave it to cure for at least 28 days. Remember, this is just one step of pool construction. When we include the other steps in constructing a concrete pool, it takes about 45 to 75 days to complete it. But it is good to note that curing time is highly dependent on the weather conditions.

Apart from the curing process, concrete pools require professionalism and expertise during construction. So, if you hire unreliable pool builders, the project might take longer than anticipated. Also, if your pool layout is intricate, the time to build a pool may take longer.

Stage : Designing The Pool

How Long Does It Take To Build A Pool?

During this stage of the process, the design of your dream pool will come to shape. Start by meeting with a pool professional and talking to them about your vision. They may use 3D modeling technology so you can see how your pool will look once its built. Even though the technology makes the process smoother and faster, it will still take some time because of the back and forth communications between you and the professional. After all, you want to make sure your pool design is perfect before moving on to the next stage!

Recommended Reading: Can Lice Live In Chlorine Pools

Quick Summary Of Length To Build A Gunite Pool

One of the most common and difficult questions about gunite pools, how long does a pool take to build? The question is not hard to answer because a pool builder does not know. Instead, it is hard to answer because while a pool may be the focal point of a backyard project, it is not the only part.

Swimming pool construction takes the size of the pool and many feet beyond. Unless there are space constraints, this is commonly where the patio will be placed. Pools demand a big area that often conflict with the other backyard projects. These conflicts can affect the time frame of construction.

Our team has detailed some things that affect how long it takes to build a swimming pool. To help homeowners understand their role, weve broken things down into two maine categories, items in your control and outside of your control.

At SSG, we find that analogies are helpful. How long your pool will take to build is like asking how long your work commute is in the morning. Most of the time, youre pretty close with estimations, give or take 5-10 minutes. Occasionally, theres a big accident that extends timelines. Building a pool involves many uncontrollable factors for the builder and the homeowner. By working together and having good communication, the factors that are controllable can be handled properly on both sides.

Design Decisions

Additional Backyard Structures

Your Electrician

Complex Designs

Timing of Construction

Final Fill of Water

Are You Ready To Start With Your Pool Installation

As you can see, there isa lot to consider in the steps it takes to build a pool. Many people who have done it will tell you it was one of the best decisions theyve made.

However, it can quickly become one of the worst decisions if you dont have the right financing in place.

Get started with SuperMoneys loan offer engine to receive personalized offers from several leading lenders. You can then compare each lender, plus many others, to ensure you make the best decision.

Youll then be one step closer to finally having the pool youve always dreamed of.

Read Also: Above Ground Pool Heating Options

How Long Does It Take To Build A Pool

Summer will be here soon, and temperatures are already heating up. After a stressful winter, we dont blame you for dreaming of spending your days floating in your backyard pool. But before you can enjoy the many social and health benefits of having your own pool, youll need to design and build it. As you gaze out your window at increasingly sunny days, you may be wondering, How long does it take to build a pool?

Stage : Getting The Right Permits

How Long Does it Take to Build a Swimming Pool?

Each city and country has different requirements when it comes to permitting your inground pool. Getting the required permits is important because it will show your neighbors, local professionals, and city or country officials that the pool was built safely, legally, and according to local code.

Your pool professional understands the requirements in your area, so you should speak with them about how long this process will take. Some jurisdictions may be able to issue a permit in a manner of weeks while others may have a more complex application process which can take months.

You May Like: Jones Beach Parking Fee After Labor Day

The Pool Design Process

The very first step in having a pool built is going through the pool design phase. The timeline for this is going to vary dramatically based on how quickly you, the customer, makes a decision. Oftentimes, there is a lot of back and forth. While the timeline to turn a design around is typically 2 to 4 weeks, the ball is in your court in terms of finalizing the design and signing the contract.

Its important to mention that design meetings should take place with all of the household decision makers present. After all, a pool is a big investment and its ideal for everyone to be certain all decision-makers are on board before beginning the design. The last thing that youd want is the design to be held up even longer because of failing to be on the same page. There are dozens of directions that could be taken on everything from size, shape, materials, and even features. We dont want to complete a design only to find out its not what everyone wants.

The Pool Construction Company:

The pool contractors you hire undoubtedly affect the time taken to build a gunite pool. For instance, when you employ an incompetent pool company, they will take longer. This is because they are likely to send very few contractors onsite. Also, an incompetent pool company is likely to make mistakes during the project. And this can significantly extend the pool construction period. Conversely, hiring reliable contractors helps you complete construction within a short period.

Don’t Miss: Remove Scale From Pool Tile

Learn More About How Long Does It Take To Build A Pool

When youre wondering, How long does it take to build a pool?, the short answer is about twenty-eight weeks.

There are a lot of factors that go into designing your pool, but there are some things that can help the process go more smoothly.

For more advice and help on building pools and other home improvement projects, make sure that you explore our website to find more just like this one!

Constructing A Gunite Pool

How Long Does It Take To Build A Pool? | California Pools & Landscape

It takes about two weeks from the day of excavation to the day your crew will construct the concrete shell of your pool. Then, that concrete has to set for 28 days before the plaster coating can be applied.

During those 28 days, your crew can attend to the electrical, tile and patio work. Unlike the vinyl pool liner, gunite pools dont need that extra dirt excavated, so the patio can go in right away. Once the plaster is on, water can go in, and youre all set.

So a gunite pool, from digging to swimming, takes about six to eight weeks to complete the full pool install.

Also Check: How To Remove Metals From Pool Water

Do All Swimming Pools Take The Same Length Of Time To Install

No, the advantage of some pool installations is that they take less time to install. This suits a lot of people. They dont want to spend 6 months installing a swimming pool.

In addition to the pool installation, which includes the shell, filtration, heating etc. the ground works will need to be completed. Groundworks can be completed in around a week. But even once that is built, the pool build is not out of the danger zone. Groundwater gathering round the pool during heavy rain is a serious danger if not pumped away.

Related content:

Have Us Install A Vinyl Or Fiberglass Pool With Fun Water Features

Our installers at our pool company take a holistic approach to your new pool construction. When designing a pool, we consider the context of its surroundings, including the backyard area and the architecture of your home.

Our customer service is second to none and our award-winning inground pool installation company can build you the pool of your dreams.

If youre in Hudson Valley, call . Westchester, call . Cold Spring, call , and in Connecticut, call . Or fill out our web form, and well get in touch with you to schedule a complimentary swimming pool consultation that will go over the average prices of installation costs.

We do our pool projects with the finest materials in the industry. We can build high-end pools of any shape and size using a variety of different materials to ensure that your pool will exceed your expectations.

You May Like: Semi Inground Pools Buffalo Ny

Permits In Your Municipality

Another way where you live can impact pool construction timeline relates to building permits.

Now, if you live in a rural area orin some statesa suburb, you may be in luck: Local agencies may not require a permit for an inground pool. But typically, this is the exception to the rule.

How long it takes to obtain permits varies wildly, from a few days to weeksand in some areas, even months.

Again, the time of year may play a role: The same building department may turn around a permit in November a heck of a lot quicker than it will in April when a flood of applications comes in.

Even in the same county, the speed of permit issuances can cross the spectrum. One city may crank out permits in a week another two months.

The size of the metropolitan market and current construction activity can make a big difference. So can government funding of a planning departments budget. In some cases, a recent regulatory change creates confusion and takes time for proper implementation.

However, some departments are simply far faster, and some contractors would say more or less competent than others.

Your local gunite pool contractor is an expert in your market. They understand how long municipal agencies take to review plans and issue permits.

Florida Swimming Pool Construction Permits

Central Florida Swimming Pool Construction, How Long Does It Take to ...

Pool construction permits is another factor where an experienced pool contractor can have a big impact on your projects timeline. Your pool contractor will discuss expected timelines for permitting, as they are unique to each area. Permitting timeframes change throughout the year. Finding and choosing an experienced, local pool builder is important as they can help move through the permitting process swiftly, and also have knowledge about any permitting requirements that are unique to your particular area.

Read Also: How To Get Metal Out Of Pool Water

Weather Affects Swimming Pool Construction

Without question, weather is the primary factor affecting the completion dates of custom in-ground swimming pool construction projects. When it rains, the construction process is either completely stalled or significantly delayed. Even if you live in the Southeastern United States, temperature changes can have an impact on your project timeline.

What Is The Difference Between A Hot Tub And A Spa Connected To My Pool

Generally, a hot tub tends to be more therapeutic. In-ground spas that connect to your pool have a limitation on the number of jets and seats, and other features, that can be included.

Hot tubs vary in size, shape and jets, and can also be part of a backyard transformation. Some hot tubs can even be installed to fit into the overall environment through the use of walls, rock formations and other integration techniques.

Also Check: Can Lice Live In Chlorine Pools

RELATED ARTICLES
- Advertisment -

Most Popular

- Advertisment -